A bit of warmup operation for HEAS

Post by Richard Hull » Sat Sep 11, 2021 12:01 am

The fusor V has been languishing for a month and a half. This means terrible performance until the walls are loaded. which means I have started to do my usual "build up" to the HEAS event with daily runs.
I will show just how terrible it is at the start.

All reports are at 40kv and about 10-11 ma.
Watch the associated pressure versus one minute best neutron count....

Date..... pressure microns.. Raw neutron count/min (TIER multiplier is 4.9 as determined via Bob Riete's rem ball system last HEAS 2020)
9/5..............5.0......................3608
9/6 .............5.2......................9520
9/7 .............5.7.....................11,050
9/8 .............6.1.....................16,183
9/9 .............6.9.....................21,261......Tier = 104,179 n/s Easy Rhodium activation
9/10............6.7.....................27,882......TIER = 136,622 n/s 42kv @8.8ma
9/11............7.1.....................34,275......TIER = 167,703 n/s 41kv @9.5ma first 5 sec count on Rh was 10X background
9/12............8.4.....................45,101......TIER = 220,994 n/s
9/13............9.5.....................54,589......TIER = 267,486 n/s 42kv @10ma
9/14............10.5....................72,255......TIER = 354,050 n/s 44kv@ 10ma
9/15............11.5....................86,136......TIER = 422,066 n/s 43kv@10.5ma
9/18............12.5....................90,086......TIER = 441,421 n/s 42kv@13ma
9/19............12.8....................97,221......TIER = 479,383 n/s 45kv@11ma.

Gotta' keep that pressure limit at 40kv going up. Gotta' stoke more fuel into the beast's walls.
At the best I might expect well over 110,000 raw counts/minute at 10-12 microns at my limit near 44kv > 500k n/s TIER

Keeping the home fusion fires burnin'

Richard Hull
Progress may have been a good thing once, but it just went on too long. - Yogi Berra
Fusion is the energy of the future....and it always will be
Retired now...Doing only what I want and not what I should...every day is a saturday.

User avatar
Frank Sanns
Site Admin
Posts: 1825
Joined: Fri Jun 14, 2002 6:26 pm
Real name: Frank Sanns
Location: Pittsburgh, PA USA

Re: A bit of warmup operation for HEAS

Post by Frank Sanns » Sat Sep 11, 2021 2:29 am

Forget about neutron numbers and high voltages on the first days of operation. Throttle the vacuum down a bit and put more fuel in there so the voltage drops down to 20 kv and run for a couple hours. Then push up the voltages and it will respond. Running too lean takes too long to get the chamber conditioned.

Now you know why I am not in the one hour club. A sitting Fusor sucks to get up to good numbers. At least once you have them loaded up, opening it for a very short time then getting it back down is not nearly as bad as a true cold start with a chamber that has been sitting for a month.

User avatar
Richard Hull
Moderator
Posts: 13299
Joined: Fri Jun 15, 2001 1:44 pm
Real name: Richard Hull

Re: A bit of warmup operation for HEAS

Post by Richard Hull » Sun Sep 12, 2021 6:16 am

Follow the original post day by day as I add run data. It is either amazing how much 2 microns over the 5 original can do.....Or how much wall loading I am getting to react better with that extra two microns at the same voltages and current levels.

Richard Hull
Progress may have been a good thing once, but it just went on too long. - Yogi Berra
Fusion is the energy of the future....and it always will be
Retired now...Doing only what I want and not what I should...every day is a saturday.

User avatar
Frank Sanns
Site Admin
Posts: 1825
Joined: Fri Jun 14, 2002 6:26 pm
Real name: Frank Sanns
Location: Pittsburgh, PA USA

Re: A bit of warmup operation for HEAS

Post by Frank Sanns » Fri Sep 17, 2021 9:54 pm

Here is the 11 day plot of your constant voltage data Richard.

Sorry for the piss poor graph but yet another one of my softwares is no longer compatible with the latest Apple OS. It is not properly scaled or labeled but I refuse to learn another freaking graphing system. Give me Lotus 123 from 1985 and I will give you all. Even my old Matlab and Maple no longer work. Unbelievable and I refuse to pay yet again for another license to use softwares that I have already purchased, some multiple times. Add Adobe to that list of scoundrels.

Back to the topic. Just looking at the curve, one would predict that higher and higher pressure would give exponentially increasing numbers. Of course the limit will be when MFP gets too short to get the job done. Enter the smaller, more efficient fusor or fusor variation.

Keep the data coming and we will see where there plateau comes but it is unfortunately not far off.
Attachments
Screen Shot 2021-09-17 at 5.45.42 PM.png

User avatar
Richard Hull
Moderator
Posts: 13299
Joined: Fri Jun 15, 2001 1:44 pm
Real name: Richard Hull

Re: A bit of warmup operation for HEAS

Post by Richard Hull » Sat Sep 18, 2021 3:01 am

Just added another data point. After 3 days of no runs, I had to fight like hell to beat the old numbers. It was tough to get to 75,000 cpm. I won by opening up the vacuum conductance and using a bit more flow on D2. to bust the 90 Kcpm mark. I attach the current Rhodium activation graph. First 5 second count was at 16X background.
Thanks for the graph you created Frank. Interesting take on the data.

Richard Hull
Attachments
RhodiumActivation9-18-21.jpg
Progress may have been a good thing once, but it just went on too long. - Yogi Berra
Fusion is the energy of the future....and it always will be
Retired now...Doing only what I want and not what I should...every day is a saturday.